Solar park Coevorden

The location has an installed capacity of 6.5 MWp, providing more than 1,800 households with sustainable electricity. The solar park was built in 2019 and has since been acquired by Vattenfall.

Area
7 hectare
Installed capacity
6,5 MWp
Annual yield
6.175 MWh
Number of households
1.800
Design and
permit
Permit
Construction
Operational
Zonnepark Wolvega - PowerField

Capacity: 5 MWP
Status: Commissioning

Read more
Zonnepark Wanneperveen - PowerField

Capacity: 28 MWP
Status: Commissioning

Read more
Zonnepark Vlagtwedde II

Capacity: 101 MWP
Status: Permit

Read more