Solar park Gasselternijveen

Solar park Gasselternijveen was completed and connected to the electricity grid in the autumn of 2020. The location is approximately 3 hectares and has an installed capacity of approximately 3.2 MWp. This is roughly equivalent to the consumption of 870 average Dutch households.

Area
3 hectare
Installed capacity
3,2 MWp
Annual yield
3.040 MWh
Number of households
870